Case Study: Sizergh Castle, Cumbria

Case Study: Sizergh Castle, Cumbria

Orb Rope Access were asked to carry out repairs, cleaning and down pipe inspection at Sizergh Castle, Cumbria The brief In November 2020, Orb Rope Access were appointed by an architect local to Cumbria to complete slate repairs, clean gutters and carry out a downpipe...
Case Study: Liverpool Anglican Cathedral

Case Study: Liverpool Anglican Cathedral

Orb Rope Access were asked to carry out a physical inspection of Liverpool Anglican Cathedral’s Tower and Statues The brief In August 2020, following a drone photogrammetry inspection of Liverpool Cathedral’s tower, external structures and statues, Orb Rope...
Case Study: St Johns ABC Building

Case Study: St Johns ABC Building

The brief We were initially asked to paint some rendered sections of the historic St John’s ABC building in Manchester’s city centre. The project had been started by another company, but due to access constraints they’d been unable to complete the work to a...
Case Study: Scarisbrick Hall

Case Study: Scarisbrick Hall

The brief Orb Rope Access were asked to inspect the outside of Scarisbrick Hall’s tower for loose stonework. Scarisbrick Hall is a listed building and country house, built in the 16th century. Today, it is used as a school and is on the Heritage at Risk Register. Any...